Read the property first
High points, low points, existing ditches, structures, driveways and downstream outlets all affect the grading plan.
Correct the grade
Reshape problem areas to improve positive drainage, reduce ponding and create more usable ground where the site allows.
Coordinate with other sitework
Clearing, driveway work, excavation and septic can all change drainage. The best time to address water is before the site is considered finished.
Questions
Can grading fix standing water?
Sometimes. The cause may be surface grade, poor outlet conditions, soil, groundwater or a combination. The site needs to be reviewed before promising a solution.
Do you install drainage pipe?
Drainage work can involve grading, ditches, culverts or pipe depending on the site and agreed scope.
Can you grade after land clearing?
Yes. Clearing and grading are often complementary when the goal is a usable yard, access route, building area or maintainable acreage.